DELTA 29 0 567 SVN]'`uMtT Y{ex The requirements were based on discussion by all people in the group of the product and of the information from the customer elicitation meeting This may conflict with the need to do intensive processing for functions like handwriting recognition or format conversion. Delays will be have to be acceptable in offline (not in the classroom) processing. This may conflict with the need to have a large number of features (formats to import/export, processing to do). Any features that we do not expect to be needed while in a classroom taking notes can require more clicks and some menu navigationENDREP id: g.6.r38/670 type: file pred: g.6.r29/11863 count: 7 text: 38 0 648 4135 789272372b73ff457a459b040b5e6768 props: 13 813 39 0 1703d930ef116053fdc618cdd0845e2a cpath: /Requirements/FinalizedRequirements.txt copyroot: 29 /Requirements/FinalizedRequirements.txt PLAIN K 25 FinalizedRequirements.txt V 16 file g.6.r38/670 K 27 PreliminaryRequirements.txt V 18 file l.7.r29/12384 K 18 Prioritization.xls V 18 file p.0.r29/12178 END ENDREP id: o.0.r38/1107 type: dir pred: o.0.r29/12767 count: 1 text: 38 932 162 162 de88cb112a22e4ff9e41d82ecb50a45b cpath: /Requirements copyroot: 0 / PLAIN K 23 CompetitiveAnalysis.txt V 16 file f.1.r32/228 K 25 CustomerFeedbackGathering V 16 dir m.0.r28/4102 K 23 PreliminaryUseCases.txt V 17 file r.0.r37/1156 K 29 ProductConceptDescription.txt V 17 file h.0.r17/1680 K 15 RelatedProducts V 15 dir 5.0.r5/4216 K 12 Requirements V 16 dir o.0.r38/1107 K 21 SubmissionPackage.txt V 16 file q.0.r36/383 K 8 plan.txt V 16 file e.0.r12/103 END ENDREP id: 0.0.r38/1650 type: dir pred: 0.0.r37/1761 count: 38 text: 38 1253 384 384 d7e93ff095a57eae912d86eda0a7755f cpath: / copyroot: 0 / g.6.t37-1 modify true false /Requirements/FinalizedRequirements.txt 1650 1785