5/03 (Mon): Prototype for demo (Milestone II features).
5/05 (Wed): Milestone III.
Week of 5/9/04
5/10 (Mon): Milestone IV.
5/11 (Tue): Project code freeze.
5/12 (Wed): Documentation.
5/13 (Thu): Submit project (deadline).
Major Milestones
Milestone I.
Design Document.
Code Refactoring according to UML diagram.
Test plan.
Basic driver:
Launcher.
Tilted pinball board (no hole).
Milestone II.
Flippers.
Hole.
Terrains.
Basic scoring.
Keyboard input.
To test responsiveness.
(Collision Bounding).
Milestone III.
Textures.
Prototype level for shipping.
(Dynamic level behavior).
(Multiple balls).
(Dynamic obstacles).
[Text (lighting permitting)].
Milestone IV.
Final level design.
High score table.
(Multi-player capability).
NOTE: (Round brackets) means risky feature. [Square brackets] means that the feature may be pushed to a future milestone.
-- DominikSlusarczyk - 15 Apr 2004